RANDALL BENTON/rbenton@sacbee.com

The people mover consists of two tracks with shuttles that run between Terminal B and the concourse building with the boarding gates. Alternatives such as a tunnel with rolling sidewalks were rejected as less effective and more costly when Sacramento International Airport's new terminal was designed and built.

close window