More Videos

Things get a little rowdy at troubled Northern California water district 1:19

Things get a little rowdy at troubled Northern California water district

Take a look inside Floyd Mayweather's new $25.5 million Beverly Hills mansion 0:42

Take a look inside Floyd Mayweather's new $25.5 million Beverly Hills mansion

More NFL players sit, take a knee following Trump criticism 1:44

More NFL players sit, take a knee following Trump criticism

Farm-to-Fork draws large crowds at Capitol Mall 0:39

Farm-to-Fork draws large crowds at Capitol Mall

Trump says any NFL player who sits during anthem is 'son of a bitch' and should be fired 0:51

Trump says any NFL player who sits during anthem is 'son of a bitch' and should be fired

Watch scenes from Sacramento County's biggest road construction project 0:58

Watch scenes from Sacramento County's biggest road construction project

Parents share challenges they face with children who have rare genetic mutation 2:25

Parents share challenges they face with children who have rare genetic mutation

Video leads to arrest of burglary suspect 0:31

Video leads to arrest of burglary suspect

Trump says any NFL player who sits during anthem is 'son of a bitch' and should be fired 0:51

Trump says any NFL player who sits during anthem is 'son of a bitch' and should be fired

Shanahan: 'We just need to get better' 2:53

Shanahan: 'We just need to get better'

  • Fly over the Oroville Dam spillway as repair works continues into September

    Oroville Dam spillway construction is progressing at a fast pace, according to the Department of Water Resources, as large volumes of concrete are placed in multiple areas of the flood control spillway throughout the day. The large void in the central area of the chute, shown in this video posted Sept. 2, 2017, is being filled with roller-compacted concrete, while leveling concrete is poured in the upper chute.

Oroville Dam spillway construction is progressing at a fast pace, according to the Department of Water Resources, as large volumes of concrete are placed in multiple areas of the flood control spillway throughout the day. The large void in the central area of the chute, shown in this video posted Sept. 2, 2017, is being filled with roller-compacted concrete, while leveling concrete is poured in the upper chute. California epartment of Water Resources
Oroville Dam spillway construction is progressing at a fast pace, according to the Department of Water Resources, as large volumes of concrete are placed in multiple areas of the flood control spillway throughout the day. The large void in the central area of the chute, shown in this video posted Sept. 2, 2017, is being filled with roller-compacted concrete, while leveling concrete is poured in the upper chute. California epartment of Water Resources

‘All there in the files’ – Oroville Dam investigators say inspectors missed clues

September 05, 2017 11:30 AM

Comments